Interstate Waters Hot Topics

 

Missouri River 2008-2009 Final Operating Plan
The Missouri River 2008-2009 Final Annual Operating Plan was released on December 30, 2008.

Missouri River 2009-2010 Draft Operating Plan New icon.
The Missouri River 2009-2010 Draft Operating Plan was released in September 2009.  Comments are due to the Corps by November 20, 2009.

Missouri River Authorized Purposes Study New icon.
The U.S. Army Corps of Engineers is undertaking a 5-year, $25 million study of the authorized purposes of Missouri River basin projects.  Officially known as the Missouri River Authorized Purposes Study, it will review the 1944 Flood Control Act to determine if changes are needed to the designated purposes of basin projects and existing federal water resource infrastructure managed by the Corps and Bureau of Reclamation.